Friday 20 July 2012

19th July 2012 - Sherrat's Wood - Day 1

Main set up complete. Very wet underfoot and the extra distance for the carrying has taken its toll. Everything had to be barrowed through the mud. The Beer was all dropped in the wrong place - well it was the right place when we dropped it - but a long way away from where we wanted it in the end !!
But the Kitchen is mainly done and ready to go.


Very wet shoes and boots - they are drying under the fire - hopefully we will not get trench foot...
Long day .. Tired.. Night


No comments:

Post a Comment